Skip to live intelligence
NTRY.AILIVEAI DASHBOARD

COUNTRIES / APAC + MIDDLE EAST · 20 MARKETS IN SCOPE

Explore a market.

Hover or focus a map marker for a snapshot. Select a country to open its findings, charts and source records.

PHYSICAL FACILITY INVENTORY

Who is building where?

Explore documented data-centre activity across 20 markets. Available facility details include dated sources; an operating label retains the date of its source.

452campus / site groups in research

545research records, including supporting rows

452 research campus / site groups · Inventory snapshot . Source dates vary; coverage is incomplete.

AnnouncedProposedApproved / permittedFinancedGroundbrokenUnder constructionCommissionedOperatingUnknown

Country aggregates · no facility pins

On smaller screens, scroll the map sideways to view every country.

Singapore

All lifecycle states

30 research campus / site groups.

38 research records across all lifecycle states in Singapore, including building / phase observations and unresolved identities. These records are not additional campuses.

Research totals describe NTRY’s documented inventory. They are not a complete market census, fresh operating verification or accepted evidence. Source and identity checks determine which named details can be released.

Facility details are not yet available for this selection. This is a coverage gap, not evidence of no data centres.

Campus / site groups are counted once; supporting building and phase rows do not add campus counts. Named facility details are a subset of this inventory and must not be added to its counts. Planning approval is not construction or operation. Accepted measurements remain separate from facility counts.

Market evidence for Singapore

Source-linked measurements and news provide context for the facility inventory. Evidence records do not add sites to its counts.

MARKET SNAPSHOT

Singapore

6 cited records · 6 accepted observations · 0 pending review

13 cited research updates · context only
  • Ministry of Energy and Trade and Industry · Written reply · modelling and balancing electricity and water demandOFFICIAL POLICY POSITION · ANSWER 7 OCT 2026 · DC-CFA2 APPLICANTS ≥50% GREEN ENERGY · FACILITY PUE REQUIREMENT UNDER BILL · WATER RULES POSSIBLE · NOT SITE POWER

    Singapore puts AI data-centre power and water into national planning—and facility efficiency on the policy path

    Singapore · national policy / DC-CFA2 · Published 07 Oct 2026

    Official policy context—not a quantified demand forecast, data-centre load measurement, site allocation, firm grid connection, water entitlement or operating capacity. The reply publishes no demand-model values, PUE threshold, water standard or named-site allocations. The ≥50% green-energy condition applies to applicants in DC-CFA2; it is not a blanket rule for every Singapore facility. PUE requirements are described as future requirements under a recently introduced bill; the reply does not establish commencement or the final threshold. Water-efficiency requirements may be introduced but are not shown as currently applied. Excluded from operating-capacity totals and scores.Ministry of Energy and Trade and Industry, Singapore source ↗
  • Singapore Parliament / MDDI / IMDA · Digital Infrastructure Bill and 2024 sector electricity demandREPORTED PASSED 7 OCT 2026 · COMMENCEMENT UNVERIFIED · MINISTRY EXPECTED 2027 · 2024 NATIONAL ELECTRICITY USE · RATED-LOAD LICENSING GATES

    Singapore Bill reportedly passed; official speech reports about 6.5 TWh used in 2024

    Singapore · national data-centre sector · Published 07 Oct 2026

    Passage is not commencement: current Gazette commencement dates, final Codes of Practice and substantive compliance deadlines were not verified. The announced 2027 timing is a ministry expectation, not an appointed date; the six-month window is for licence applications, not a deadline to meet every requirement. The 2024 demand statements are rounded national aggregates, not facility load, grid headroom, occupancy or utilisation. The WUE figure is a policy target, not measured performance or a verified mandatory threshold. Neither a repeatable annual series nor a published calculation method is supplied; this remains contextual and excluded from governed longitudinal totals. The licensing regimes have different service scope and exemptions; a ≥10 MW own-use enterprise facility is not automatically a major third-party service. Excluded from operating-capacity totals and scores.Singapore Ministry of Digital Development and Information source ↗
  • Singapore Energy Market Authority · Singapore power systemOFFICIAL VERSION 4 FORECAST · SYSTEM-WIDE RESERVE MARGIN · 2030 UPPER-CASE SHORTFALL · NOT SITE HEADROOM

    EMA's upper-demand reserve margin falls below the required 27% from 2030

    Singapore · Published 08 Sept 2026

    These are national planning forecasts and RFP requirements, not observed demand, awarded or constructed generation, operating capacity, firm supply, connection headroom or a facility SLA. The upper-bound demand scenario includes prospective projects across energy-intensive sectors such as semiconductors and data centres, but it does not quantify data-centre load or establish causation. Reserve margin is system-wide, not campus-ready power. The supply projection excludes imports until they are firm, and the requested 2031–2032 units receive zero operating-capacity credit. Values use Version 4's current figures; redlined superseded values are excluded. Excluded from operating-capacity totals and scores.Singapore Energy Market Authority source ↗
  • SINGSTAT / Energy Market Authority · National electricity systemOFFICIAL 2021–2024 SSIC 2020 SERIES · BROAD INFORMATION & COMMUNICATIONS CATEGORY · NOT DATA-CENTRE LOAD

    Singapore's broad information-and-communications category used 50.7% more electricity in 2024 than in 2021

    Singapore · Published 23 Jun 2026

    National annual industry-classification context only. The Information and Communications category is broader than data centres and includes other information, communications and digital-service activities; the source does not isolate data-centre electricity use. The series is demand, not available capacity, reserve margin, grid-connection headroom, contracted power or deliverable site power. Values before 2021 use SSIC 2015, so this chart begins in 2021 and does not bridge the classification break. No hyperscaler causation is inferred. Excluded from operating-capacity totals and scores.Singapore Department of Statistics source ↗
  • Energy Market Authority · National electricity systemOFFICIAL 2020–2024 NATIONAL RELIABILITY SERIES · SUSTAINED INTERRUPTIONS · NOT A FACILITY SLA

    Singapore customers averaged 0.26 minutes of sustained interruptions in 2024

    Singapore · Published 13 Apr 2026

    National annual customer-average reliability context only. SAIDI and SAIFI cover sustained interruptions; they do not measure voltage dips, momentary events, power quality, event concentration, substation redundancy, data-centre availability, contractual SLA performance or a named campus's resilience. The 2024 increase from 0.14 to 0.26 minutes is one annual movement and is not treated as a structural trend. Excluded from operating-capacity totals and scores.Energy Market Authority, Singapore source ↗
  • Energy Market Authority · National electricity systemOFFICIAL 1975–2025 NATIONAL GENERATION SERIES · 2025 CONSUMPTION UNAVAILABLE · CONTEXT ONLY

    Singapore electricity generation reached 60,410.4 GWh in 2025

    Singapore · Published 23 Jun 2026

    National annual generation context only. Generation is not available capacity, reserve margin, grid-connection headroom, contracted or delivered site power, or data-centre load. The source reports 2025 electricity consumption as unavailable, so no 2025 generation-consumption balance or surplus is inferred. Dataset classification footnotes are retained; sector rows spanning 2020–2021 require care because the source changes from SSIC 2015 to SSIC 2020. Excluded from operating-capacity totals and scores.SINGSTAT / Energy Market Authority source ↗
  • Singapore electricity system · National all-sector electricity consumptionOFFICIAL ANNUAL CONSUMPTION SERIES · NATIONAL ALL-SECTOR DEMAND · COMPLETE 2024 YEAR · NOT DATA-CENTRE-SPECIFIC

    Singapore electricity consumption reached 58 TWh in 2024—as information and communications grew faster

    Singapore · Published 11 Oct 2026

    These are rounded annual national consumption totals across all sectors. The information-and-communications growth rate includes activities beyond data centres and is not a data-centre electricity-use figure. Consumption is not peak demand, generation capacity, reserve margin, grid headroom, contracted power or campus-available supply, so it cannot size a data-centre supply gap or enter operating-capacity totals. Excluded from operating-capacity totals and scores.Singapore Energy Market Authority source ↗
  • Singapore Energy Market Authority · National electricity gridOFFICIAL ANNUAL GRID SERIES · NATIONAL AVERAGE · NOT DATA-CENTRE-SPECIFIC

    Singapore's grid carbon intensity falls below its 2022 peak—but remains gas-led

    Singapore · Published 09 Oct 2026

    This is a generation-weighted annual national-grid average, not a data-centre-specific footprint, contracted clean-energy share, hourly marginal-emissions profile or proof of renewable additionality. It does not identify which generators serve a facility, distinguish imported electricity, or show DC-CFA2 compliance, so it cannot be converted into workload MW, operating capacity or an allocation score. Excluded from operating-capacity totals and scores.Singapore Energy Market Authority / National Climate Change Secretariat source ↗
  • Ministry of Energy, Trade and Industry · DC-CFA2 supported data centresCAPACITY SUPPORT CONDITIONAL · PRIMARY GRID SUPPLY · LOW-CARBON REPORTING REQUIRED · NOT OPERATING

    Singapore says the 200 MW DC-CFA2 tranche will rely mainly on the grid

    Singapore · Published 10 Sept 2026

    The 200 MW is supported data-centre capacity, not measured electricity demand or operating IT load. The reply gives no grid-versus-solar MW split, commissioning dates, delivered power, fuel-specific allocation or utilisation. The more-than-half low-carbon share is a future condition of capacity support, not verified generation or consumption today. Excluded from operating-capacity totals and scores.Singapore Ministry of Energy, Trade and Industry source ↗
  • Singapore Department of Statistics · National enterprise infocomm usageOFFICIAL ANNUAL ENTERPRISE ADOPTION SERIES · DEMAND PROXY · NOT WORKLOAD MW

    Singapore enterprise cloud use more than doubles to 41% in five years

    Singapore · Published 20 Apr 2026

    This is a national enterprise technology-adoption series covering all enterprises, not contracted workload, cloud revenue, data-centre occupancy, utilisation, electricity demand or MW. Usage may be served from infrastructure outside Singapore, so the series cannot close the numerical supply-demand gap or enter capacity totals. Excluded from operating-capacity totals and scores.Singapore Department of Statistics via data.gov.sg source ↗
  • Digital Realty · Jurong Island DC-CFA2 facilityPROVISIONAL 50 MW ALLOCATION · DELIVERY DATE UNDISCLOSED · NOT OPERATING

    Digital Realty receives a provisional 50 MW Jurong Island allocation

    Jurong Island · Published 24 Aug 2026

    The 50 MW allocation is provisional, is nested within the 200 MW DC-CFA2 tranche and must not be added to that tranche. The new facility is not operating; no final approval, commissioning date, delivered power, customer occupancy or utilisation is disclosed. The green-energy share is a design commitment, while the existing 84 MW is a company-reported combined platform figure—not available capacity. Excluded from operating-capacity totals and scores.Digital Realty source ↗
  • Nxera / Singtel · DC TuasFACILITY OPENING ANNOUNCED · UTILISATION UNDISCLOSED

    Nxera announces the opening of its largest Singapore data centre

    Tuas · Published 09 Feb 2026

    This is an operator opening announcement. The release does not establish customer occupancy, utilised IT load, delivered power at review time or a market-wide supply increase. Excluded from operating-capacity totals and scores.Singtel source ↗
  • EDB / IMDA · Second Data Centre Call for ApplicationPROVISIONAL ALLOCATION · APPROVALS PENDING · NOT OPERATING

    Singapore provisionally allocates 200 MW across four DC-CFA2 proposals

    Singapore · Published 21 Aug 2026

    The allocation is provisional and remains subject to approval and implementation processes. It is not operating capacity, and the release does not establish an IT-load basis for aggregation. Excluded from operating-capacity totals and scores.Singapore Economic Development Board source ↗
  • ST Telemedia Global Data CentresAwarded · Accepted

    Singapore · Evidence 21 Aug 2026

    Development pipeline capacity. STTGDC was selected under DC-CFA2 to develop 50 MW of new Singapore data-centre capacity. The award remains subject to approval and implementation processes and is not operating capacity; the publisher does not label the figure as operating IT load.STTGDC Singapore DC-CFA2 release source ↗

5 other proposals concern policy, demand, grid load, investment or broader market context.

Accepted development measurements · Singapore · 1 record

These accepted measurements can describe a campus, phase or wider programme. They are not additional facilities and are not added to the inventory. A site relationship is shown only after its identity is matched.

  • ST Telemedia Global Data CentresAccepted evidence · Awarded

    Development pipeline capacity · Evidence 21 Aug 2026

    STTGDC was selected under DC-CFA2 to develop 50 MW of new Singapore data-centre capacity. The award remains subject to approval and implementation processes and is not operating capacity; the publisher does not label the figure as operating IT load.STTGDC Singapore DC-CFA2 release source ↗

One physical facility map; lifecycle and evidence review remain separate. Power allocations, MW, capital plans and programme measurements never become extra facility counts.

EXPLORE BY COUNTRY

Your market, in focus.

COUNTRY OVERVIEW

Singapore

13 cited research updates · 10 contextual charts · latest source publication 2026-10-11

How to read this view

Contextual research informs diligence; it does not change accepted observations, governed coverage or rankings. Governed views use the returned evidence feed; missing or bounded records are not proof of no market activity.

NTRY LIVEWHAT CHANGED
AND WHY IT MATTERS
RECENT ARTICLES · SOURCE FACTS & ANALYSIS
FILTER BY THEME, GEOGRAPHY, COMPANY OR EFFECT3 / 14
POWER / SYSTEM DEMANDSingaporeCONTEXT ONLYSingapore electricity consumption reached 58 TWh in 2024—as information and communications grew faster

Singapore's Energy Market Authority reports total electricity consumption rising from 52 TWh in 2019 to 58 TWh in 2024, an 11.5% increase on the published annual totals. EMA reports 4.0% growth in 2024 and identifies information and communications as one of the faster-growing sub-sectors at 12.3%, without isolating data-centre load.

PROJECT STAGE
OFFICIAL ANNUAL CONSUMPTION SERIES · NATIONAL ALL-SECTOR DEMAND · COMPLETE 2024 YEAR · NOT DATA-CENTRE-SPECIFIC
2019 consumption
52 TWh
2024 consumption
58 TWh
2019–2024 change
+11.5%
2024 information & communications growth
+12.3%

CAVEAT These are rounded annual national consumption totals across all sectors. The information-and-communications growth rate includes activities beyond data centres and is not a data-centre electricity-use figure. Consumption is not peak demand, generation capacity, reserve margin, grid headroom, contracted power or campus-available supply, so it cannot size a data-centre supply gap or enter operating-capacity totals.

Singapore Energy Market Authority · 11 Oct 2026 · Context only · excluded from capacity totals
POWER / GRID CARBON INTENSITYSingaporeCONTEXT ONLYSingapore's grid carbon intensity falls below its 2022 peak—but remains gas-led

Official Singapore data show the national grid emission factor at 0.409 kg CO₂/kWh in 2019, peaking at 0.417 in 2022 before falling to 0.412 in 2023 and 0.402 in 2024. EMA attributes the latest decline to a higher solar share and lower generator emissions intensity, while natural gas still supplied 94.0% of the 2024 electricity mix.

PROJECT STAGE
OFFICIAL ANNUAL GRID SERIES · NATIONAL AVERAGE · NOT DATA-CENTRE-SPECIFIC
2019 grid factor
0.409 kg CO₂/kWh
2022 peak
0.417 kg CO₂/kWh
2024 grid factor
0.402 kg CO₂/kWh
2024 natural-gas share
94.0%

CAVEAT This is a generation-weighted annual national-grid average, not a data-centre-specific footprint, contracted clean-energy share, hourly marginal-emissions profile or proof of renewable additionality. It does not identify which generators serve a facility, distinguish imported electricity, or show DC-CFA2 compliance, so it cannot be converted into workload MW, operating capacity or an allocation score.

Singapore Energy Market Authority / National Climate Change Secretariat · 09 Oct 2026 · Context only · excluded from capacity totals
POLICY / ENERGY AND WATER EFFICIENCYSingaporeCONTEXT ONLYSingapore puts AI data-centre power and water into national planning—and facility efficiency on the policy path

In a 7 October 2026 parliamentary reply, Singapore's ministry said projected electricity and water demand from data centres, including AI computing, is factored into national infrastructure planning. Applicants in the second DC-CFA exercise were required to power at least 50% of capacity from green-energy sources. The ministry also said the Digital Infrastructure Bill will require facility-level PUE compliance for existing and new centres, while allowing water-efficiency requirements to be introduced where necessary.

PROJECT STAGE
OFFICIAL POLICY POSITION · ANSWER 7 OCT 2026 · DC-CFA2 APPLICANTS ≥50% GREEN ENERGY · FACILITY PUE REQUIREMENT UNDER BILL · WATER RULES POSSIBLE · NOT SITE POWER
Planning horizon in parliamentary question
5–10 years · no numeric demand forecast published
DC-CFA2 green-energy condition
At least 50% of capacity · second-round applicants
Facility efficiency
PUE requirements described in bill · threshold not stated
Water efficiency
Requirements may be introduced where necessary

CAVEAT Official policy context—not a quantified demand forecast, data-centre load measurement, site allocation, firm grid connection, water entitlement or operating capacity. The reply publishes no demand-model values, PUE threshold, water standard or named-site allocations. The ≥50% green-energy condition applies to applicants in DC-CFA2; it is not a blanket rule for every Singapore facility. PUE requirements are described as future requirements under a recently introduced bill; the reply does not establish commencement or the final threshold. Water-efficiency requirements may be introduced but are not shown as currently applied.

Ministry of Energy and Trade and Industry, Singapore · 07 Oct 2026 · Context only · excluded from capacity totals

Showing the latest three items. Source facts remain separate from NTRY analysis; every item includes a caveat. Hover or focus to pause.

POPULATION × DIGITAL REACH · SINGAPORE

How large is the digital demand backdrop?

Inspect Singapore population, internet participation and business adoption. Regional comparisons are optional below. These are demand proxies; they do not measure local compute workloads or available data-centre capacity.

Singapore · 2024 population × internet participation

Horizontal axis: population, logarithmic scale. Vertical axis: individuals using the internet, % of population. Select a point or choose a market below.

0%25%50%75%100%1m10m100m1000mMedian populationMedian reachSingapore: 6m people · 94.4% · 2024SGPopulation (millions, log scale)
Singapore · relative to the 18-market 2024 panel median0.2× panel median population · -1.1 pp internet participation

Panel medians are 31.2m people and 95.5% internet participation. They are descriptive reference lines—not targets, scores, demand forecasts or investment thresholds.

World Bank WDI / ITU · fixed 2024 comparison · 18 matched economies. Dashed guides are panel medians. Unverified or conflicting cells are omitted, never plotted as zero.

Singapore · population movement · 2023–2024 · 1 matching midyear series

Market size and population growth answer different questions. Switch between percentage change and people added; select a bar to inspect its source. Market order is alphabetical.

Shared zero line · left: decrease · right: increase · percent change from the 2023 base. Bar lengths use one common scale. Mint: increase · slate: decrease · amber: selected market.

Source: World Bank WDI population estimates, CC BY 4.0; exact source links appear in each profile. NTRY calculation: (2024 − 2023) / 2023 × 100; absolute change is 2024 − 2023. Taiwan’s year-end registered-population series remains separate in its profile. Population change does not establish customer spend, local workloads or causation.

Singapore · digital participation movement · 2019–2024 · 1 matching series

Compare reported digital-participation change on its own, or place it beside population movement. Select any point or bar to inspect the exact dated history and source.

Horizontal: 2023→2024 population change, %. Vertical: 2019→2024 internet-participation change, percentage points. Same source series within each axis; periods intentionally remain distinct. Amber: selected market.

-10 pp0 pp10 pp20 pp30 pp40 pp0%2%4%6%8%Singapore: population +2.01% · internet participation +5.4 ppSGPopulation change, 2023–2024 (%)
Singapore · two contextual movementsPopulation +2.01% · digital participation +5.4 pp

Population uses 2023→2024 midyear estimates; digital participation uses the 2019→2024 internet-use series. Different periods and units remain separate.

Sources: World Bank WDI population estimates and WDI / ITU indicator “Individuals using the Internet (% of population)”, CC BY 4.0; exact source links appear in each profile. NTRY calculations: 2024 population − 2023 population as a percent of the 2023 base; 2024 internet-use value − 2019 value. The relationship view has 1 matched markets. China and Taiwan remain outside it because their retained internet observations use unresolved or different denominators. Survey methods and historical revisions can create apparent movement; neither view measures enterprise adoption, compute demand or causation.

Population6m2024 · 6,036,860 persons
Internet participation94.4%2024 · individuals, not enterprises
Population movement · 2023 → 2024+119,212 people · +2.01%

5,917,648 → 6,036,860 persons. World Bank country/economy midyear estimates on the displayed source basis.

Population estimates may be modelled and revised; not a census count or measure of local compute demand. Internet-use survey quality, frames and reference periods can differ among reporting economies. Annual population and internet percentages must not be interpreted as enterprise AI adoption, spending, or campus-ready power.

Internet participation over time

Internet participation movement · 2019 → 2024+5.4 percentage points

88.9% → 94.4% of population on the displayed World Bank / ITU indicator basis. Historical revisions and survey-method changes remain possible.

0%25%50%75%100%Individuals using the internet · 2019: 88.9%Individuals using the internet · 2020: 92%Individuals using the internet · 2021: 96.9%Individuals using the internet · 2022: 96%Individuals using the internet · 2023: 94.3%Individuals using the internet · 2024: 94.4%201920202021202220232024
  • Individuals using the internet
Exact dated observations
MetricReference periodPercent
Individuals using the internet201988.9%
Individuals using the internet202092%
Individuals using the internet202196.9%
Individuals using the internet202296%
Individuals using the internet202394.3%
Individuals using the internet202494.4%

Source-reported contextual history. Historical revisions and national survey differences remain possible.

Compare Singapore with other markets · ChatGPT use and estimated AI adoption

Optional regional comparison. These charts intentionally include other countries; the selected profile remains Singapore.

PROVIDER-PUBLISHED USAGE · OPENAI SIGNALS V2.0

How much ChatGPT conversation is work-related?

June 2026 · 18/20 markets. Compare the work-related share of consumer ChatGPT messages, then select a market to inspect its monthly history. The percentage describes messages within each market; it is not a business-adoption rate or provider market share.

Common 0–100% scale · alphabetical order · mint: published share · amber: selected market · unknown: no released observation. Select a row to update all demand evidence.

Singapore · June 2026 · work-related message share46.1%

24/24 monthly observations in this release. Automated publisher classification; messages, not users or businesses.

0%25%50%75%100%Jul 2024: 68.9%Aug 2024: 65.8%Sep 2024: 66.0%Oct 2024: 66.2%Nov 2024: 64.8%Dec 2024: 64.2%Jan 2025: 58.8%Feb 2025: 58.6%Mar 2025: 56.6%Apr 2025: 52.3%May 2025: 55.1%Jun 2025: 48.2%Jul 2025: 51.7%Aug 2025: 48.1%Sep 2025: 50.1%Oct 2025: 48.7%Nov 2025: 49.6%Dec 2025: 46.2%Jan 2026: 50.0%Feb 2026: 44.4%Mar 2026: 48.7%Apr 2026: 46.5%May 2026: 44.5%Jun 2026: 46.1%Jul 2024Jan 2025Jul 2025Jan 2026Jun 2026
Exact monthly observations and gaps
Month (UTC)Work-related sharePublished fraction
Jul 202468.9%0.689
Aug 202465.8%0.658
Sep 202466.0%0.660
Oct 202466.2%0.662
Nov 202464.8%0.648
Dec 202464.2%0.642
Jan 202558.8%0.588
Feb 202558.6%0.586
Mar 202556.6%0.566
Apr 202552.3%0.523
May 202555.1%0.551
Jun 202548.2%0.482
Jul 202551.7%0.517
Aug 202548.1%0.481
Sep 202550.1%0.501
Oct 202548.7%0.487
Nov 202549.6%0.496
Dec 202546.2%0.462
Jan 202650.0%0.500
Feb 202644.4%0.444
Mar 202648.7%0.487
Apr 202646.5%0.465
May 202644.5%0.445
Jun 202646.1%0.461
Singapore · Q2 2026 · population-adjusted ChatGPT message-use rank#1 of 147

Lower rank number means higher consumer ChatGPT message use relative to 2023 population within the publisher's country panel.

#1#50#100#147Jan 2025: rank #2Apr 2025: rank #2Jul 2025: rank #1Oct 2025: rank #1Jan 2026: rank #1Apr 2026: rank #1Jan '2025Apr '2025Jul '2025Oct '2025Jan '2026Apr '2026
Exact quarterly population-adjusted ranks
QuarterPublished rankPopulation basis
Jan 2025#22023 World Bank population
Apr 2025#22023 World Bank population
Jul 2025#12023 World Bank population
Oct 2025#12023 World Bank population
Jan 2026#12023 World Bank population
Apr 2026#12023 World Bank population
Decision use: separate use intensity from work orientation.

Work-related share shows the composition of messages within a market; the ordinal rank shows population-adjusted consumer ChatGPT message use across countries. Together they can prioritise deeper demand diligence, but neither measures adoption, users, absolute message volume, paid enterprise demand, provider market share, local workload hosting or compute demand.

Singapore · Q2 2026 · two-publisher demand context#1 of 147 · 64.3% estimated AI use

OpenAI population-adjusted consumer message-use rank paired with Microsoft's estimated share of people ages 15–64 using any generative-AI product.

0%20%40%60%80%Australia: OpenAI rank #19; Microsoft estimated AI use 40.7%India: OpenAI rank #109; Microsoft estimated AI use 18.5%Indonesia: OpenAI rank #101; Microsoft estimated AI use 14.8%Japan: OpenAI rank #57; Microsoft estimated AI use 24.7%Kuwait: OpenAI rank #69; Microsoft estimated AI use 22.6%Malaysia: OpenAI rank #59; Microsoft estimated AI use 22.6%New Zealand: OpenAI rank #40; Microsoft estimated AI use 44.1%Oman: OpenAI rank #74; Microsoft estimated AI use 27.6%Philippines: OpenAI rank #92; Microsoft estimated AI use 20.7%Qatar: OpenAI rank #34; Microsoft estimated AI use 43.5%Saudi Arabia: OpenAI rank #49; Microsoft estimated AI use 31.4%Singapore: OpenAI rank #1; Microsoft estimated AI use 64.3%SingaporeSouth Korea: OpenAI rank #25; Microsoft estimated AI use 40.6%Taiwan: OpenAI rank #62; Microsoft estimated AI use 33.8%Thailand: OpenAI rank #96; Microsoft estimated AI use 13.4%United Arab Emirates: OpenAI rank #6; Microsoft estimated AI use 73.3%Vietnam: OpenAI rank #88; Microsoft estimated AI use 27.9%lower population-adjusted ChatGPT usehigher use

Dashed lines are the descriptive medians of the 17 matched markets: rank #59 and 27.9% estimated AI use. They are not targets or thresholds.

Decision use: test whether two independent demand signals point in the same direction.

The relationship can flag markets for deeper diligence when population-adjusted ChatGPT message use and the broader Microsoft generative-AI-use estimate diverge or align. Different products, populations, methods and denominators make this contextual triangulation—not provider market share, adoption proof, a composite score, causal evidence, compute demand or an allocation rule.

Claude and Gemini: comparable country-by-month measures are not included in this view. No cross-provider share or composite adoption score is calculated.

Source, population, precision and reuse

Consumer ChatGPT messages from Free, Go, Plus and Pro accounts with declared age at least 18; excludes Enterprise and Codex, deleted accounts and users who opt out of training.

300,000 messages sampled globally per month; day-weighted, automatically classified work-relatedness; differential privacy and rounding to 3 decimals. Country is associated with request. Rank uses 2023 World Bank population. Values are publisher estimates; granular country slices have greater sampling variance. Changes may reflect user composition, classification and restatements. This is external contextual history, with no semantic acceptance or NTRY inference.

Chatterji, Cunningham, Deming, Hitzig, Johnston, Richmond, Ong, Shan and Wadman, OpenAI Signals v2.0 · CC BY 4.0. NTRY modifications: selected country rows, conversion of fractions to percentages, monthly chart, quarterly ordinal-rank chart, cross-publisher descriptive scatter and missing-value display. Snapshot checked 12 October 2026; data ends June 2026. The public downloads are verified source material; this contextual panel does not create accepted observations or NTRY inference.

ESTABLISHED CROSS-MARKET ADOPTION PROXY · MICROSOFT AI DIFFUSION

How widely is generative AI being used?

Q2 2026 · 18/20 NTRY markets · 72 dated estimates. Microsoft estimates the share of people ages 15–64 who used a generative AI product. This is a broad usage measure—not ChatGPT, Claude or Gemini market share.

Ranked Q2 2026 estimate · common 0–100% scale · mint: published estimate · amber: selected market · unknown: no economy estimate in this release.

Population scale × generative-AI use

Horizontal: 2024 population, logarithmic scale. Vertical: Microsoft Q2 2026 AI Diffusion estimate. Dashed guides are the 18-market panel medians—not targets, scores or allocation thresholds. Select a point to inspect its evidence.

0%20%40%60%80%5m10m100m1000mUnited Arab Emirates: 11m people · 73.3% estimated AI useSingapore: 6m people · 64.3% estimated AI useSingaporeNew Zealand: 5.3m people · 44.1% estimated AI useQatar: 2.9m people · 43.5% estimated AI useAustralia: 27.2m people · 40.7% estimated AI useSouth Korea: 51.8m people · 40.6% estimated AI useTaiwan: 23.4m people · 33.8% estimated AI useSaudi Arabia: 35.3m people · 31.4% estimated AI useVietnam: 101m people · 27.9% estimated AI useOman: 5.3m people · 27.6% estimated AI useJapan: 124m people · 24.7% estimated AI useKuwait: 4.9m people · 22.6% estimated AI useMalaysia: 35.6m people · 22.6% estimated AI usePhilippines: 115.8m people · 20.7% estimated AI useIndia: 1,450.9m people · 18.5% estimated AI useChina: 1,409m people · 17.5% estimated AI useIndonesia: 283.5m people · 14.8% estimated AI useThailand: 71.7m people · 13.4% estimated AI usePopulation (millions, log scale)
Singapore · two separate contextual observations6m people · 64.3% estimated AI use

0.2× the panel median population · +36.5 percentage points versus the panel median AI-use estimate.

The axes intentionally retain different reference periods and definitions. Their position is descriptive context only: it does not estimate addressable users, enterprise demand, compute load, revenue, hosting location, power need or causation.

Singapore · Q2 2026 · ages 15–64 estimated usage64.3%

4 published estimates · H1 2025 58.6% → Q2 2026 64.3% · +5.7 percentage points.

0%25%50%75%100%H1 2025: 58.6%H1 2025H2 2025: 60.9%H2 2025Q1 2026: 63.4%Q1 2026Q2 2026: 64.3%Q2 2026
Exact dated estimates
PeriodEstimated adoption
H1 202558.6%
H2 202560.9%
Q1 202663.4%
Q2 202664.3%
Decision use: identify where broad consumer generative-AI use may deepen demand diligence.

Use this as a comparable adoption proxy beside population, digital reach and official enterprise surveys. It can prioritize questions about paid business demand, local workload placement and connectivity. It cannot size compute, power, revenue, capacity headroom or hyperscaler allocation.

The population×AI scatter and ranked bars are used instead of a radar chart. They preserve actual magnitudes, ordering and unknown values without normalizing unrelated evidence into a composite score.

Source, method, revisions and limits

Estimated share of people ages 15–64 who used a generative AI product during the period. Microsoft aggregates and anonymizes consumer AI telemetry, then adjusts estimates for operating-system and device-market share, internet penetration and population.

Microsoft describes this as an estimate from aggregated, anonymized consumer telemetry. Results can move with product coverage, calibration, internet access and historical revisions. The measure is usage—not skill, productivity, business adoption, spending, provider share, compute demand, hosting location or infrastructure capacity.

NTRY modifications: exact selection of the 20-market universe, labels aligned to NTRY market names, percentage parsing, ranking and selected-market trend. Snapshot checked 2026-10-12. The public dataset is verified source material; this contextual panel does not create accepted observations or NTRY inference.

Population is country/economy context, not a utility service territory. World Bank WDI population values are midyear estimates; Taiwan uses separately sourced year-end registered population and is excluded from the shared scatter. Internet use is the share of individuals who used the internet. World Bank / ITU attribution, CC BY 4.0. NTRY modifications: 2024 selection, rounding, chart rendering and within-series percentage-point changes and 2023–2024 population differences. These sources provide context only; this panel does not create accepted observations or an investment conclusion.

MARKET EVIDENCE

Findings to examine

Source-linked context and NTRY interpretation. Open each finding to inspect its limits.

01Singapore · CONTEXT

Singapore electricity consumption reached 58 TWh in 2024—as information and communications grew faster

WHY IT MATTERS · NTRY INTERPRETATION

Keep Singapore attractive for high-value constrained workloads; release additional campus capital only against firm power allocation, delivery dates and a credible low-carbon supply path.

What to verify and evidence limitsWhat to verify next

Data-centre-specific load, system peak-demand forecasts, licensed generation availability, connection-queue evidence and firm campus power allocations.

Project stage and scope

OFFICIAL ANNUAL CONSUMPTION SERIES · NATIONAL ALL-SECTOR DEMAND · COMPLETE 2024 YEAR · NOT DATA-CENTRE-SPECIFIC

These are rounded annual national consumption totals across all sectors. The information-and-communications growth rate includes activities beyond data centres and is not a data-centre electricity-use figure. Consumption is not peak demand, generation capacity, reserve margin, grid headroom, contracted power or campus-available supply, so it cannot size a data-centre supply gap or enter operating-capacity totals.

Evidence period / effective date: 2024-12-31

02Singapore · CONTEXT

Singapore's grid carbon intensity falls below its 2022 peak—but remains gas-led

WHY IT MATTERS · NTRY INTERPRETATION

Treat lower grid intensity as supportive, not sufficient; require credible low-carbon procurement and hourly matching.

What to verify and evidence limitsWhat to verify next

Facility-level contracted clean-energy share, imported-electricity attribution and hourly emissions.

Project stage and scope

OFFICIAL ANNUAL GRID SERIES · NATIONAL AVERAGE · NOT DATA-CENTRE-SPECIFIC

This is a generation-weighted annual national-grid average, not a data-centre-specific footprint, contracted clean-energy share, hourly marginal-emissions profile or proof of renewable additionality. It does not identify which generators serve a facility, distinguish imported electricity, or show DC-CFA2 compliance, so it cannot be converted into workload MW, operating capacity or an allocation score.

Evidence period / effective date: 2024-12-31

03Singapore · CONTEXT

Singapore puts AI data-centre power and water into national planning—and facility efficiency on the policy path

WHY IT MATTERS · NTRY INTERPRETATION

For a Singapore entry or expansion, diligence the applicable DC-CFA award conditions, green-energy sourcing, facility PUE obligations and any water-efficiency rules before sizing the phase. Do not treat policy eligibility as a firm grid connection, an energy allocation or a water entitlement.

What to verify and evidence limitsWhat to verify next

The enacted bill and commencement date; final PUE thresholds and compliance rules; any issued water-efficiency standard; published DC-CFA2 award conditions by operator; and named-site electricity, green-energy and water allocations.

Project stage and scope

OFFICIAL POLICY POSITION · ANSWER 7 OCT 2026 · DC-CFA2 APPLICANTS ≥50% GREEN ENERGY · FACILITY PUE REQUIREMENT UNDER BILL · WATER RULES POSSIBLE · NOT SITE POWER

Official policy context—not a quantified demand forecast, data-centre load measurement, site allocation, firm grid connection, water entitlement or operating capacity. The reply publishes no demand-model values, PUE threshold, water standard or named-site allocations. The ≥50% green-energy condition applies to applicants in DC-CFA2; it is not a blanket rule for every Singapore facility. PUE requirements are described as future requirements under a recently introduced bill; the reply does not establish commencement or the final threshold. Water-efficiency requirements may be introduced but are not shown as currently applied.

Evidence period / effective date: 2026-10-07

CITED RESEARCH UPDATES

Explore the evidence

Source-reported developments, with project stage and caveats. These updates do not change accepted measurements, capacity totals or rankings.

10 decision charts · scoped evidence visuals in Singapore · scroll horizontally to explore, or use the controls
EVIDENCE IDENTITY CHECK1 duplicate source view collapsed across equivalent source, effective period and series values. Counts below use unique evidence identities.
DECISION CHARTSOfficial, evidence-bound market visuals are surfaced first. Use Evidence shape to separate repeated history from point-in-time and project-stage comparisons.
Manual browsing · reduced motion
1 of 10
Singapore · SingaporePublished Effective

Singapore electricity consumption reached 58 TWh in 2024—as information and communications grew faster

OFFICIAL ANNUAL CONSUMPTION SERIES · NATIONAL ALL-SECTOR DEMAND · COMPLETE 2024 YEAR · NOT DATA-CENTRE-SPECIFIC

Singapore's Energy Market Authority reports total electricity consumption rising from 52 TWh in 2019 to 58 TWh in 2024, an 11.5% increase on the published annual totals. EMA reports 4.0% growth in 2024 and identifies information and communications as one of the faster-growing sub-sectors at 12.3%, without isolating data-centre load.

2019 consumption
52 TWh
2024 consumption
58 TWh
2019–2024 change
+11.5%
2024 information & communications growth
+12.3%
Singapore total electricity consumptionTWh
  1. 201952 TWh
  2. 202051 TWh
  3. 202154 TWh
  4. 202255 TWh
  5. 202355 TWh
  6. 202458 TWh

Historical series · repeated dated points · context only · excluded from governed totals

Caveat: These are rounded annual national consumption totals across all sectors. The information-and-communications growth rate includes activities beyond data centres and is not a data-centre electricity-use figure. Consumption is not peak demand, generation capacity, reserve margin, grid headroom, contracted power or campus-available supply, so it cannot size a data-centre supply gap or enter operating-capacity totals.

Singapore · SingaporePublished Effective

Singapore's grid carbon intensity falls below its 2022 peak—but remains gas-led

OFFICIAL ANNUAL GRID SERIES · NATIONAL AVERAGE · NOT DATA-CENTRE-SPECIFIC

Official Singapore data show the national grid emission factor at 0.409 kg CO₂/kWh in 2019, peaking at 0.417 in 2022 before falling to 0.412 in 2023 and 0.402 in 2024. EMA attributes the latest decline to a higher solar share and lower generator emissions intensity, while natural gas still supplied 94.0% of the 2024 electricity mix.

2019 grid factor
0.409 kg CO₂/kWh
2022 peak
0.417 kg CO₂/kWh
2024 grid factor
0.402 kg CO₂/kWh
2024 natural-gas share
94.0%
Singapore grid emission factor — selected official pointskg CO₂/kWh
  1. 20190.409 kg CO₂/kWh
  2. 20220.417 kg CO₂/kWh
  3. 20230.412 kg CO₂/kWh
  4. 20240.402 kg CO₂/kWh

Historical series · repeated dated points · context only · excluded from governed totals

Caveat: This is a generation-weighted annual national-grid average, not a data-centre-specific footprint, contracted clean-energy share, hourly marginal-emissions profile or proof of renewable additionality. It does not identify which generators serve a facility, distinguish imported electricity, or show DC-CFA2 compliance, so it cannot be converted into workload MW, operating capacity or an allocation score.

Singapore · Singapore · national data-centre sectorPublished Effective

Singapore Bill reportedly passed; official speech reports about 6.5 TWh used in 2024

REPORTED PASSED 7 OCT 2026 · COMMENCEMENT UNVERIFIED · MINISTRY EXPECTED 2027 · 2024 NATIONAL ELECTRICITY USE · RATED-LOAD LICENSING GATES

CNA reported Parliament passed the Bill on 7 October 2026. The 6 October opening speech sets sustainability licensing for new and existing data centres at ≥3 MW rated critical IT load, including own-use enterprise facilities. The ≥10 MW security/resilience regime covers cloud and co-location data-centre facility services. Critical IT load is maximum design IT/network power, not instantaneous consumption. The 7 October closing speech reports about 6.5 TWh used in 2024, slightly more than 10% of national electricity consumption, and PUB's WUE target of ≤2 m³/MWh for new and existing data centres. MDDI expected staged commencement in 2027; existing operators would have six months from commencement to apply, with continued operation while IMDA considers their application.

2024 data-centre electricity use
About 6.5 TWh · national aggregate
Share of national electricity consumption
Slightly more than 10% · rounded official statement
Sustainability-licence threshold
≥3 MW rated critical IT load · new and existing DCs, including own-use enterprise
Security/resilience facility-service threshold
≥10 MW rated critical IT load · cloud/co-location services
Commencement expectation announced 7 Oct
2027 · ministry expectation, not verified Gazette date
Existing-operator application window
Six months from relevant commencement · may operate while application considered
PUB Water Usage Effectiveness target
≤2 m³/MWh · target, not measured compliance
Singapore Digital Infrastructure Bill — data-centre licensing thresholds after passageMW rated critical IT load · commencement unverified · distinct licensing scopes
  1. All covered DCs≥3 MW · sustainability
  2. Cloud / colo≥10 MW · facility services

Point-in-time comparison · not a trend · context only · excluded from governed totals

Caveat: Passage is not commencement: current Gazette commencement dates, final Codes of Practice and substantive compliance deadlines were not verified. The announced 2027 timing is a ministry expectation, not an appointed date; the six-month window is for licence applications, not a deadline to meet every requirement. The 2024 demand statements are rounded national aggregates, not facility load, grid headroom, occupancy or utilisation. The WUE figure is a policy target, not measured performance or a verified mandatory threshold. Neither a repeatable annual series nor a published calculation method is supplied; this remains contextual and excluded from governed longitudinal totals. The licensing regimes have different service scope and exemptions; a ≥10 MW own-use enterprise facility is not automatically a major third-party service.

Singapore · SingaporePublished Effective

Singapore says the 200 MW DC-CFA2 tranche will rely mainly on the grid

CAPACITY SUPPORT CONDITIONAL · PRIMARY GRID SUPPLY · LOW-CARBON REPORTING REQUIRED · NOT OPERATING

Singapore's energy ministry says the four supported DC-CFA2 data centres, equal to about 12% of national data-centre capacity, will draw electricity primarily from the national grid with on-site solar supplementation. More than half of the supported capacity is committed to Singapore-based low-carbon generation, and operators must report total electricity use and substantiate the low-carbon share to IMDA and EDB.

Supported tranche
200 MW
Share of national DC capacity
≈12%
Electricity route
Primarily grid + on-site solar
Singapore low-carbon commitment
>50%
Singapore DC-CFA2 supported capacityMW · conditional support, not operating
  1. Supported tranche200 MW

Stage comparison · statuses are not additive · context only · excluded from governed totals

Caveat: The 200 MW is supported data-centre capacity, not measured electricity demand or operating IT load. The reply gives no grid-versus-solar MW split, commissioning dates, delivered power, fuel-specific allocation or utilisation. The more-than-half low-carbon share is a future condition of capacity support, not verified generation or consumption today.

Singapore · SingaporePublished Effective

EMA's upper-demand reserve margin falls below the required 27% from 2030

OFFICIAL VERSION 4 FORECAST · SYSTEM-WIDE RESERVE MARGIN · 2030 UPPER-CASE SHORTFALL · NOT SITE HEADROOM

EMA's 8 September 2026 Version 4 RFP forecasts upper-bound system peak demand rising from 9.2 GW in 2026 to 14.4 GW in 2034. Against projected supply, the corresponding reserve margin is 27% in 2029, 18% in 2030, 9% in 2031 and -1% in 2034. EMA is seeking one new CCGT unit of at least 600 MW for 2031 and up to five units of at least 500 MW each for 2032.

Required reserve margin
27% · system-wide
2030 upper-case reserve margin
18%
2031 upper-case reserve margin
9%
2034 upper-case reserve margin
-1%
Singapore upper-demand reserve-margin forecast — EMA Version 4% · system-wide forecast; required margin 27%; not site headroom
  1. 202629% · above requirement
  2. 202737% · above requirement
  3. 202836% · above requirement
  4. 202927% · at requirement
  5. 203018% · below requirement
  6. 20319% · below requirement
  7. 20327% · below requirement
  8. 20335% · below requirement
EMA required reserve margin: 27%

Stage comparison · statuses are not additive · context only · excluded from governed totals

Caveat: These are national planning forecasts and RFP requirements, not observed demand, awarded or constructed generation, operating capacity, firm supply, connection headroom or a facility SLA. The upper-bound demand scenario includes prospective projects across energy-intensive sectors such as semiconductors and data centres, but it does not quantify data-centre load or establish causation. Reserve margin is system-wide, not campus-ready power. The supply projection excludes imports until they are firm, and the requested 2031–2032 units receive zero operating-capacity credit. Values use Version 4's current figures; redlined superseded values are excluded.

Singapore · Jurong IslandPublished Effective

Digital Realty receives a provisional 50 MW Jurong Island allocation

PROVISIONAL 50 MW ALLOCATION · DELIVERY DATE UNDISCLOSED · NOT OPERATING

Digital Realty says Singapore's DC-CFA2 process provisionally allocated 50 MW for a planned fourth facility on Jurong Island, designed to power more than half of its capacity through green-energy pathways. The company separately reports three existing Singapore data centres with about 84 MW of combined capacity.

Provisional new allocation
50 MW
Existing platform
≈84 MW / 3 sites
Singapore DC-CFA2 provisional capacity — total tranche and Digital Realty allocationMW · nested provisional scopes; not additive and not operating
  1. DC-CFA2 tranche200 MW provisional
  2. Digital Realty50 MW provisional

Stage comparison · statuses are not additive · context only · excluded from governed totals

Caveat: The 50 MW allocation is provisional, is nested within the 200 MW DC-CFA2 tranche and must not be added to that tranche. The new facility is not operating; no final approval, commissioning date, delivered power, customer occupancy or utilisation is disclosed. The green-energy share is a design commitment, while the existing 84 MW is a company-reported combined platform figure—not available capacity.

Link to this update ↗Digital Realty · Read source ↗Primary-source statement · Context only
Singapore · SingaporePublished Effective

Singapore's broad information-and-communications category used 50.7% more electricity in 2024 than in 2021

OFFICIAL 2021–2024 SSIC 2020 SERIES · BROAD INFORMATION & COMMUNICATIONS CATEGORY · NOT DATA-CENTRE LOAD

The official SINGSTAT dataset reports electricity consumption by the broad Information and Communications category increasing from 4,029.0 GWh in 2021 to 6,072.0 GWh in 2024. Its share of national electricity consumption rose from 7.53% to 10.53% over the same SSIC 2020 classification window.

2024 category electricity use
6,072.0 GWh
2021–2024 change
+50.7%
2024 national share
10.53%
2021 national share
7.53%
Singapore information & communications electricity consumption — 2021–2024GWh · broad SSIC 2020 industry category
  1. 20214,029.0 GWh
  2. 20224,852.4 GWh
  3. 20235,408.5 GWh
  4. 20246,072.0 GWh

Historical series · repeated dated points · context only · excluded from governed totals

Caveat: National annual industry-classification context only. The Information and Communications category is broader than data centres and includes other information, communications and digital-service activities; the source does not isolate data-centre electricity use. The series is demand, not available capacity, reserve margin, grid-connection headroom, contracted power or deliverable site power. Values before 2021 use SSIC 2015, so this chart begins in 2021 and does not bridge the classification break. No hyperscaler causation is inferred.

Singapore · SingaporePublished Effective

Singapore electricity generation reached 60,410.4 GWh in 2025

OFFICIAL 1975–2025 NATIONAL GENERATION SERIES · 2025 CONSUMPTION UNAVAILABLE · CONTEXT ONLY

The official SINGSTAT dataset reports Singapore electricity generation increasing from 54,142.3 GWh in 2019 to 60,410.4 GWh in 2025, an 11.6% rise. Generation increased 1.3% from 2024 to 2025; the same dataset marks 2025 electricity consumption as unavailable.

2025 electricity generation
60,410.4 GWh
2019–2025 change
+11.6%
2024–2025 change
+1.3%
2025 consumption
Unavailable
Singapore electricity generation — 2019–2025GWh · national annual generation
  1. 201954,142.3 GWh
  2. 202053,071.6 GWh
  3. 202155,788.3 GWh
  4. 202257,113.7 GWh
  5. 202357,384.2 GWh
  6. 202459,616.1 GWh
  7. 202560,410.4 GWh

Historical series · repeated dated points · context only · excluded from governed totals

Caveat: National annual generation context only. Generation is not available capacity, reserve margin, grid-connection headroom, contracted or delivered site power, or data-centre load. The source reports 2025 electricity consumption as unavailable, so no 2025 generation-consumption balance or surplus is inferred. Dataset classification footnotes are retained; sector rows spanning 2020–2021 require care because the source changes from SSIC 2015 to SSIC 2020.

Singapore · SingaporePublished Effective

Singapore enterprise cloud use more than doubles to 41% in five years

OFFICIAL ANNUAL ENTERPRISE ADOPTION SERIES · DEMAND PROXY · NOT WORKLOAD MW

Official annual data show business usage of cloud-computing services rising from 19.6% in 2020 to 41% in 2025, while reported business use of artificial intelligence rose from 3.9% to 23.5%. The sequence strengthens Singapore's demand-side case as an adoption signal, but does not size data-centre demand.

Cloud use
19.6% → 41%
AI use
3.9% → 23.5%
Singapore enterprise cloud-computing adoption% of enterprises
  1. 202019.6%
  2. 202126.5%
  3. 202227.1%
  4. 202330.8%
  5. 202436%
  6. 202541%

Historical series · repeated dated points · context only · excluded from governed totals

Caveat: This is a national enterprise technology-adoption series covering all enterprises, not contracted workload, cloud revenue, data-centre occupancy, utilisation, electricity demand or MW. Usage may be served from infrastructure outside Singapore, so the series cannot close the numerical supply-demand gap or enter capacity totals.

Singapore · SingaporePublished Effective

Singapore customers averaged 0.26 minutes of sustained interruptions in 2024

OFFICIAL 2020–2024 NATIONAL RELIABILITY SERIES · SUSTAINED INTERRUPTIONS · NOT A FACILITY SLA

EMA reports a national System Average Interruption Duration Index (SAIDI) of 0.26 minutes per customer in 2024 and a System Average Interruption Frequency Index (SAIFI) of 0.006 interruptions per customer. The five-year SAIDI sequence was 0.17, 0.13, 0.16, 0.14 and 0.26 minutes from 2020 to 2024.

2024 SAIDI
0.26 min/customer
2024 SAIFI
0.006 interruptions/customer
2023–2024 SAIDI change
+0.12 min
Five-year context
2020–2024
Singapore grid interruption duration — 2020–2024SAIDI minutes per customer · sustained interruptions
  1. 20200.17 min
  2. 20210.13 min
  3. 20220.16 min
  4. 20230.14 min
  5. 20240.26 min

Historical series · repeated dated points · context only · excluded from governed totals

Caveat: National annual customer-average reliability context only. SAIDI and SAIFI cover sustained interruptions; they do not measure voltage dips, momentary events, power quality, event concentration, substation redundancy, data-centre availability, contractual SLA performance or a named campus's resilience. The 2024 increase from 0.14 to 0.26 minutes is one annual movement and is not treated as a structural trend.

SUPPLY × DEMAND · INVESTMENT LENS

Where demand meets delivery.
And where it does not.

Explore the evidence on each side of the market. Values retain their original scope and status; NTRY only calculates a gap when the records are genuinely comparable.

SingaporeDecision-eligible pair 1/2 · 13 contextual signalsGoverned proof—not a market score
Accepted delivery proofAccepted observed demandFuture pipeline / capital not current supplySource-dated context excluded from totals
DELIVERY PROOF2 accepted records

Only accepted operating, commissioned or available capacity can light this lane. Contracted power remains context until delivery is evidenced.

PHASE CONDITIONALLYDelivery proof appears before workload proof.
DELIVERYDEMANDPAIR

Operating or available capacity does not establish absorption. Accepted workload, utilisation or observed-load evidence is still required.

NUMERICAL GAP WITHHELD
DEMAND PROOF0 accepted records

Accepted workload, utilisation, pre-lease or observed-load evidence only. Forecasts, floors and declared maxima remain context.

MARKET DECISION PULSE · SINGAPORE

Realised demand is material; incremental scale is becoming explicitly licensed.

1/2comparable proof inputs
OBSERVED LOAD × REGULATORY THRESHOLDSDigital Infrastructure Bill licensing thresholds
Source-derived context · excluded from governed totals
0MW rated critical IT load · commencement unverified
SOURCE RECORDS BY STATED EVIDENCE STATE13 cited context records
Record count—not MW or a conversion rate
0Reported operating
1Launch milestone
1In delivery
1Allocated / contracted
0Announced / planned
10Policy / adoption context
DECISION EFFECTPhase capacity; require an anchor-demand hurdle before release.

Contextual demand or supply signals are visible, but cannot replace accepted observed evidence. Opportunity is a conditional path, not spare megawatts: release capital only as power, demand and delivery milestones become comparable.

SUPPLY EVIDENCEPROOF PRESENT
GOVERNED DECISION EVIDENCE · OPERATING_BASELINE_20261,600 MW

Operating data-centre capacity floor

Singapore Data Centre Sector · 8 Sept 2026

MDDI reported more than 1.6 GW of Singapore data-centre capacity on 8 September 2026. The normalized 1,600 MW value is a country-level lower bound, not available capacity, named-site capacity, utilisation, spare power or capacity accessible to one hyperscaler. Comparability with the 2024 1.4 GW baseline requires human review before any trend is inferred.

MDDI Singapore Digital Infrastructure Bill release 2026 ↗
GOVERNED DECISION EVIDENCE · OPERATING_BASELINE_20241,400 MW

Operating data-centre capacity floor

Singapore Data Centre Sector · 30 May 2024

IMDA reported more than 1.4 GW of Singapore data-centre capacity as at 30 May 2024. The normalized 1,400 MW value is an explicit lower-bound historical government baseline, not a current 2026 total, named-project capacity or capacity available to one hyperscaler.

IMDA Green Data Centre Roadmap factsheet 2024 ↗
DEMAND EVIDENCEMISSING

No cited workload-demand, utilisation or observed-load measurement is available for this market.

FUTURE PIPELINE / CAPITALNOT CURRENT SUPPLY
GOVERNED CONTEXT · NOT DECISION-GRADE · STATUS-SPECIFIC300 MW

Policy capacity expansion lower bound

Singapore Data Centre Sector · 9 Sept 2026

MDDI reaffirmed on 9 September 2026 that Singapore would work from the Green Data Centre Roadmap baseline of at least 300 MW of additional capacity. The normalized 300 MW value is a policy provision floor, not awarded, under-construction, operating or deliverable capacity.

MDDI Singapore data-centre capacity PQ 2026 ↗
GOVERNED CONTEXT · NOT DECISION-GRADE · AWARDED50 MW

Development pipeline capacity

ST Telemedia Global Data Centres · 21 Aug 2026

STTGDC was selected under DC-CFA2 to develop 50 MW of new Singapore data-centre capacity. The award remains subject to approval and implementation processes and is not operating capacity; the publisher does not label the figure as operating IT load.

STTGDC Singapore DC-CFA2 release ↗
MARKET CONTEXT · SOURCE-DATED

What could change the gap reading?

13 cited updates
DEMAND SIGNAL
Singapore electricity consumption reached 58 TWh in 2024—as information and communications grew faster

Singapore's Energy Market Authority reports total electricity consumption rising from 52 TWh in 2019 to 58 TWh in 2024, an 11.5% increase on the published annual totals. EMA reports 4.0% growth in 2024 and identifies information and communications as one of the faster-growing sub-sectors at 12.3%, without isolating data-centre load.

  • 2019 consumption52 TWh
  • 2024 consumption58 TWh
Singapore total electricity consumptionY · TWh
  1. 52 TWh2019
  2. 51 TWh2020
  3. 54 TWh2021
  4. 55 TWh2022
  5. 55 TWh2023
  6. 58 TWh2024

X · PERIODZERO BASELINE · SOURCE POINTS ONLY

OFFICIAL ANNUAL CONSUMPTION SERIES · NATIONAL ALL-SECTOR DEMAND · COMPLETE 2024 YEAR · NOT DATA-CENTRE-SPECIFICSingapore Energy Market Authority ↗
CAPACITY CONTEXT
Singapore's grid carbon intensity falls below its 2022 peak—but remains gas-led

Official Singapore data show the national grid emission factor at 0.409 kg CO₂/kWh in 2019, peaking at 0.417 in 2022 before falling to 0.412 in 2023 and 0.402 in 2024. EMA attributes the latest decline to a higher solar share and lower generator emissions intensity, while natural gas still supplied 94.0% of the 2024 electricity mix.

  • 2019 grid factor0.409 kg CO₂/kWh
  • 2022 peak0.417 kg CO₂/kWh
Singapore grid emission factor — selected official pointsY · kg CO₂/kWh
  1. 0.409 kg CO₂/kWh2019
  2. 0.417 kg CO₂/kWh2022
  3. 0.412 kg CO₂/kWh2023
  4. 0.402 kg CO₂/kWh2024

X · PERIODZERO BASELINE · SOURCE POINTS ONLY

OFFICIAL ANNUAL GRID SERIES · NATIONAL AVERAGE · NOT DATA-CENTRE-SPECIFICSingapore Energy Market Authority / National Climate Change Secretariat ↗
POLICY CONTEXT
Singapore puts AI data-centre power and water into national planning—and facility efficiency on the policy path

In a 7 October 2026 parliamentary reply, Singapore's ministry said projected electricity and water demand from data centres, including AI computing, is factored into national infrastructure planning. Applicants in the second DC-CFA exercise were required to power at least 50% of capacity from green-energy sources. The ministry also said the Digital Infrastructure Bill will require facility-level PUE compliance for existing and new centres, while allowing water-efficiency requirements to be introduced where necessary.

  • Planning horizon in parliamentary question5–10 years · no numeric demand forecast published
  • DC-CFA2 green-energy conditionAt least 50% of capacity · second-round applicants
OFFICIAL POLICY POSITION · ANSWER 7 OCT 2026 · DC-CFA2 APPLICANTS ≥50% GREEN ENERGY · FACILITY PUE REQUIREMENT UNDER BILL · WATER RULES POSSIBLE · NOT SITE POWERMinistry of Energy and Trade and Industry, Singapore ↗
CAPACITY CONTEXT
Singapore Bill reportedly passed; official speech reports about 6.5 TWh used in 2024

CNA reported Parliament passed the Bill on 7 October 2026. The 6 October opening speech sets sustainability licensing for new and existing data centres at ≥3 MW rated critical IT load, including own-use enterprise facilities. The ≥10 MW security/resilience regime covers cloud and co-location data-centre facility services. Critical IT load is maximum design IT/network power, not instantaneous consumption. The 7 October closing speech reports about 6.5 TWh used in 2024, slightly more than 10% of national electricity consumption, and PUB's WUE target of ≤2 m³/MWh for new and existing data centres. MDDI expected staged commencement in 2027; existing operators would have six months from commencement to apply, with continued operation while IMDA considers their application.

  • 2024 data-centre electricity useAbout 6.5 TWh · national aggregate
  • Share of national electricity consumptionSlightly more than 10% · rounded official statement
Singapore Digital Infrastructure Bill — data-centre licensing thresholds after passageY · MW rated critical IT load · commencement unverified · distinct licensing scopes
  1. ≥3 MW · sustainabilityAll covered DCs
  2. ≥10 MW · facility servicesCloud / colo

X · CRITICAL IT LOAD THRESHOLDZERO BASELINE · SOURCE POINTS ONLY

REPORTED PASSED 7 OCT 2026 · COMMENCEMENT UNVERIFIED · MINISTRY EXPECTED 2027 · 2024 NATIONAL ELECTRICITY USE · RATED-LOAD LICENSING GATESSingapore Ministry of Digital Development and Information ↗
CAPACITY CONTEXT
Singapore says the 200 MW DC-CFA2 tranche will rely mainly on the grid

Singapore's energy ministry says the four supported DC-CFA2 data centres, equal to about 12% of national data-centre capacity, will draw electricity primarily from the national grid with on-site solar supplementation. More than half of the supported capacity is committed to Singapore-based low-carbon generation, and operators must report total electricity use and substantiate the low-carbon share to IMDA and EDB.

  • Supported tranche200 MW
  • Share of national DC capacity≈12%
Singapore DC-CFA2 supported capacityY · MW · conditional support, not operating
  1. 200 MWSupported tranche

X · PERIODZERO BASELINE · SOURCE POINTS ONLY

CAPACITY SUPPORT CONDITIONAL · PRIMARY GRID SUPPLY · LOW-CARBON REPORTING REQUIRED · NOT OPERATINGSingapore Ministry of Energy, Trade and Industry ↗
CAPACITY CONTEXT
EMA's upper-demand reserve margin falls below the required 27% from 2030

EMA's 8 September 2026 Version 4 RFP forecasts upper-bound system peak demand rising from 9.2 GW in 2026 to 14.4 GW in 2034. Against projected supply, the corresponding reserve margin is 27% in 2029, 18% in 2030, 9% in 2031 and -1% in 2034. EMA is seeking one new CCGT unit of at least 600 MW for 2031 and up to five units of at least 500 MW each for 2032.

  • Required reserve margin27% · system-wide
  • 2030 upper-case reserve margin18%
Singapore upper-demand reserve-margin forecast — EMA Version 4Y · % · system-wide forecast; required margin 27%; not site headroom
  1. 29% · above requirement2026
  2. 37% · above requirement2027
  3. 36% · above requirement2028
  4. 27% · at requirement2029
  5. 18% · below requirement2030
  6. 9% · below requirement2031
  7. 7% · below requirement2032
  8. 5% · below requirement2033

X · FORECAST YEAR / UPPER-BOUND SCENARIOZERO BASELINE · SOURCE POINTS ONLY

OFFICIAL VERSION 4 FORECAST · SYSTEM-WIDE RESERVE MARGIN · 2030 UPPER-CASE SHORTFALL · NOT SITE HEADROOMSingapore Energy Market Authority ↗
CAPACITY CONTEXT
Digital Realty receives a provisional 50 MW Jurong Island allocation

Digital Realty says Singapore's DC-CFA2 process provisionally allocated 50 MW for a planned fourth facility on Jurong Island, designed to power more than half of its capacity through green-energy pathways. The company separately reports three existing Singapore data centres with about 84 MW of combined capacity.

  • Provisional new allocation50 MW
  • Existing platform≈84 MW / 3 sites
Singapore DC-CFA2 provisional capacity — total tranche and Digital Realty allocationY · MW · nested provisional scopes; not additive and not operating
  1. 200 MW provisionalDC-CFA2 tranche
  2. 50 MW provisionalDigital Realty

X · ALLOCATION SCOPEZERO BASELINE · SOURCE POINTS ONLY

PROVISIONAL 50 MW ALLOCATION · DELIVERY DATE UNDISCLOSED · NOT OPERATINGDigital Realty ↗
CAPACITY CONTEXT
Singapore provisionally allocates 200 MW across four DC-CFA2 proposals

EDB and IMDA provisionally allocated 200 MW of new data-centre capacity to four operators under DC-CFA2, advancing a tightly governed expansion path for the constrained Singapore market.

  • Provisionally allocated200 MW
  • Selected proposals4
PROVISIONAL ALLOCATION · APPROVALS PENDING · NOT OPERATINGSingapore Economic Development Board ↗
DEMAND SIGNAL
Singapore's broad information-and-communications category used 50.7% more electricity in 2024 than in 2021

The official SINGSTAT dataset reports electricity consumption by the broad Information and Communications category increasing from 4,029.0 GWh in 2021 to 6,072.0 GWh in 2024. Its share of national electricity consumption rose from 7.53% to 10.53% over the same SSIC 2020 classification window.

  • 2024 category electricity use6,072.0 GWh
  • 2021–2024 change+50.7%
Singapore information & communications electricity consumption — 2021–2024Y · GWh · broad SSIC 2020 industry category
  1. 4,029.0 GWh2021
  2. 4,852.4 GWh2022
  3. 5,408.5 GWh2023
  4. 6,072.0 GWh2024

X · CALENDAR YEARZERO BASELINE · SOURCE POINTS ONLY

OFFICIAL 2021–2024 SSIC 2020 SERIES · BROAD INFORMATION & COMMUNICATIONS CATEGORY · NOT DATA-CENTRE LOADSingapore Department of Statistics ↗
CAPACITY CONTEXT
Singapore electricity generation reached 60,410.4 GWh in 2025

The official SINGSTAT dataset reports Singapore electricity generation increasing from 54,142.3 GWh in 2019 to 60,410.4 GWh in 2025, an 11.6% rise. Generation increased 1.3% from 2024 to 2025; the same dataset marks 2025 electricity consumption as unavailable.

  • 2025 electricity generation60,410.4 GWh
  • 2019–2025 change+11.6%
Singapore electricity generation — 2019–2025Y · GWh · national annual generation
  1. 54,142.3 GWh2019
  2. 53,071.6 GWh2020
  3. 55,788.3 GWh2021
  4. 57,113.7 GWh2022
  5. 57,384.2 GWh2023
  6. 59,616.1 GWh2024
  7. 60,410.4 GWh2025

X · PERIODZERO BASELINE · SOURCE POINTS ONLY

OFFICIAL 1975–2025 NATIONAL GENERATION SERIES · 2025 CONSUMPTION UNAVAILABLE · CONTEXT ONLYSINGSTAT / Energy Market Authority ↗
DEMAND SIGNAL
Singapore enterprise cloud use more than doubles to 41% in five years

Official annual data show business usage of cloud-computing services rising from 19.6% in 2020 to 41% in 2025, while reported business use of artificial intelligence rose from 3.9% to 23.5%. The sequence strengthens Singapore's demand-side case as an adoption signal, but does not size data-centre demand.

  • Cloud use19.6% → 41%
  • AI use3.9% → 23.5%
Singapore enterprise cloud-computing adoptionY · % of enterprises
  1. 19.6%2020
  2. 26.5%2021
  3. 27.1%2022
  4. 30.8%2023
  5. 36%2024
  6. 41%2025

X · PERIODZERO BASELINE · SOURCE POINTS ONLY

OFFICIAL ANNUAL ENTERPRISE ADOPTION SERIES · DEMAND PROXY · NOT WORKLOAD MWSingapore Department of Statistics via data.gov.sg ↗
POLICY CONTEXT
Singapore customers averaged 0.26 minutes of sustained interruptions in 2024

EMA reports a national System Average Interruption Duration Index (SAIDI) of 0.26 minutes per customer in 2024 and a System Average Interruption Frequency Index (SAIFI) of 0.006 interruptions per customer. The five-year SAIDI sequence was 0.17, 0.13, 0.16, 0.14 and 0.26 minutes from 2020 to 2024.

  • 2024 SAIDI0.26 min/customer
  • 2024 SAIFI0.006 interruptions/customer
Singapore grid interruption duration — 2020–2024Y · SAIDI minutes per customer · sustained interruptions
  1. 0.17 min2020
  2. 0.13 min2021
  3. 0.16 min2022
  4. 0.14 min2023
  5. 0.26 min2024

X · PERIODZERO BASELINE · SOURCE POINTS ONLY

OFFICIAL 2020–2024 NATIONAL RELIABILITY SERIES · SUSTAINED INTERRUPTIONS · NOT A FACILITY SLAEnergy Market Authority, Singapore ↗
DELIVERY SIGNAL
Nxera announces the opening of its largest Singapore data centre

Singtel's Nxera announced the opening of DC Tuas as its largest multi-tenanted Singapore facility and positioned it for high-density AI workloads.

  • MarketSingapore
  • FacilityDC Tuas
FACILITY OPENING ANNOUNCED · UTILISATION UNDISCLOSEDSingtel ↗
Bars show accepted proof presence inside the selected market—not MW, probability or investment attractiveness. Forecasts, declared maxima, contracted power and pending proposals remain visible as context but cannot change the decision posture. Open any record to inspect its source, date, lifecycle and caveat.
Singapore SWOT and working hypotheses
MARKET SWOT · EVIDENCE + HYPOTHESES

What helps. What holds us back.

Governed evidence anchors the SWOT. Where evidence is still thin, NTRY states a conditional hypothesis, what would falsify it and which dated indicators must be collected next.

Singapore3 SWOT points · 6 accepted evidence recordsEvidence feed checked 27 Oct 2026

Evidence cards are governed; SWOT placement is a transparent rule-based interpretation. Working hypotheses identify questions for further evidence and do not become facts, market scores, allocation recommendations, trends or Signals.

Potential strengths

What existing advantages are reported?

NTRY WORKING HYPOTHESIS

Existing-ecosystem advantage

If Singapore can demonstrate available operating capacity, firm power and network diversity, its existing ecosystem may reduce time to deployment.

What would falsify it: Named capacity is unavailable, energisation is delayed, or comparable peer markets can deliver sooner.

Next dated indicator: Available MW, dated energisation, utilisation or pre-lease evidence, and independent network paths.

Priority evidence gaps: Grid access · Connectivity

Potential weaknesses

What local constraints are evidenced?

  • ACCEPTED OBSERVATION · RULE-BASED READING

    Resource-constrained data-centre growth policy

    RESOURCE_CONSTRAINED_CALIBRATED_GROWTH · Singapore Data Centre Sector

    Official policy says capacity growth must be calibrated against scarce land, power and water. This evidences an entry constraint, not a predetermined market cap or proof that a named site lacks capacity.

    Source, scope and what to verify

    Source statement: RESOURCE_CONSTRAINED_CALIBRATED_GROWTH

    Scope: Singapore · COUNTRY_POLICY_RESOURCE_CONSTRAINT

    Evidence date: 8 Sept 2026

    Caveat: MDDI stated on 8 September 2026 that Singapore must grow data-centre capacity in a disciplined manner because data centres are intensive users of scarce land, power and water. The statement evidences a country-level resource and allocation constraint, not a predetermined capacity cap, rejection of a specific project, site-level shortage or investment recommendation.

    What would change this assessment: Confirm the applicable capacity-allocation process, licence timing, resource-efficiency requirements, and the named site’s land, power and water entitlements.

    Read MDDI Singapore Digital Infrastructure Bill release 2026 source ↗

Potential opportunities

What future openings should we investigate?

  • ACCEPTED OBSERVATION · RULE-BASED READING

    Policy capacity expansion lower bound

    300 MW · Singapore Data Centre Sector

    An official capacity policy provides an expansion avenue to investigate. A policy target is not an award, a project entitlement or delivered capacity.

    Source, scope and what to verify

    Source statement: MDDI reaffirmed the Green Data Centre Roadmap baseline of at least 300 MW of additional data-centre capacity

    Scope: Singapore · COUNTRY_POLICY_CAPACITY_FLOOR

    Evidence date: 9 Sept 2026

    Caveat: MDDI reaffirmed on 9 September 2026 that Singapore would work from the Green Data Centre Roadmap baseline of at least 300 MW of additional capacity. The normalized 300 MW value is a policy provision floor, not awarded, under-construction, operating or deliverable capacity.

    What would change this assessment: Check eligibility, award conditions, deadlines and subsequent delivery evidence.

    Read MDDI Singapore data-centre capacity PQ 2026 source ↗
  • ACCEPTED OBSERVATION · RULE-BASED READING

    Development pipeline capacity

    50 MW · ST Telemedia Global Data Centres

    A reported development pipeline identifies expansion to investigate. Planned or under-construction capacity is not operating supply or proven demand.

    Source, scope and what to verify

    Source statement: Selected to develop 50 MW of new capacity

    Scope: Singapore · NAMED_MARKET_AWARD

    Evidence date: 21 Aug 2026

    Caveat: STTGDC was selected under DC-CFA2 to develop 50 MW of new Singapore data-centre capacity. The award remains subject to approval and implementation processes and is not operating capacity; the publisher does not label the figure as operating IT load.

    What would change this assessment: Check permits, financing, power delivery, construction milestones and anchor customers.

    Read STTGDC Singapore DC-CFA2 release source ↗

Potential threats

What external changes could undermine the plan?

NTRY WORKING HYPOTHESIS

Relative-attractiveness erosion

Power economics, connection timing, regulation or delivery risk could erode Singapore's relative attractiveness before 2031—even if headline capacity grows.

What would falsify it: Comparable evidence shows stable delivered-power cost, secured connections, predictable rules and on-time delivery.

Next dated indicator: Delivered power cost, grid delay, policy change, equipment lead time and resilience incidents.

Priority evidence gaps: Power economics · Grid access · Construction

THE UAE EVALUATION SYNOPSIS

Read the UAE build-out synopsis.

A two-page, source-bound synopsis of UAE energy demand context and capital intent, with three reviewed findings and the next diligence receipts.